YX58-156-310 Color Steel Wall Panel

  • DETAILS

When installing YX58-156-310 color steel wall panels, the following points should be noted:

1. Special tools should be used when installing the computer room wall panels, and construction personnel should pay attention to them

Before the inspection, please check if the tools are complete. The specific task is to ensure that the main materials and accessories are complete and in good condition. Specialized measuring tools should be customized and developed after inspection. If it does not meet the usage requirements, it should be replaced and repaired in a timely manner.

2. Before installation, the construction scope should be clearly defined, and the site conditions should be checked to see if they meet the wall installation requirements in the design and construction drawings. Fire prevention, dust prevention, and electrostatic shielding technologies should also be checked to see if they meet the usage conditions and relevant regulations

(1) The distance between the wellbore, working face, and axis;

(2) Identify the distance and position of control points based on the reference surface, paying attention to visibility;

(3) Calculate the distance of the installation angle based on the reference plane;

(4) The height difference with the controlled elevation;

(5) The vertical distance to the building and the distance to each floor.

It is required that the joints of anti-static wall panels are uniform, tight, and seamless, and the walls of the computer room should maintain a vertical angle. The vertical wall, the size of the computer room wall panel should be the same or longer as the wall, and the overlap with the wall should be minimized to make it close to the wall, playing an important role in the safety and aesthetics of the computer room.

After the installation of the metal sandwich panel curtain wall in the computer room is completed, remove the protective tape on the surface of the wall panel layer by layer from top to bottom, and at the same time, remove the frame layer by layer. When dismantling the frame, attention should be paid to the protection of the wall panels, avoiding scratches or scratches, and completing the construction of the entire curtain wall project. During construction, adhesives that affect the surface decoration of curtain walls and curtain wall components should be immediately removed. After the installation of the curtain wall project is completed, a top-down cleaning plan should be developed to prevent surface decoration abnormalities. The neutral detergent used for cleaning wall panels should be inspected to prove that it has no corrosive effect on the surface coating of the wall panels. After cleaning with neutral detergent, clean with clean water in a timely manner.

4. There should be no obvious concave surface at the connection point, and there should be no obvious defects such as ripple and warping after connecting the inner and outer corners. If the installation process does not meet the requirements, the construction personnel should immediately make corresponding adjustments to meet the user's requirements.


1689302060146773.jpeg



Phone: (+86) 137-7105-3760

Contact person: Mr. Xiao

Address: Workshop No. 9, Baishiao No.3, Xiashan, Hengpi Town, Enping City, Guangdong Province



Navigation


Home                          Products

About                          Cases

News                          Contact





WeChat


×
seo seo