Hotline

(+86)137-7105-3760

Home >> Products >>Wall System >>Color Steel Wall Panel >> YX18-76-988 Color Steel Wall Panel
Product Detail

YX18-76-988 Color Steel Wall Panel

  • DETAILS

YX18-76-988 color steel plate has been widely used in various buildings, and its use is very extensive. The editor mainly shares with you the installation and construction of concealed roofs with concealed buckles. This unique fixing method is more intuitive and can effectively resist typhoons. In addition to stabilizing the roof, this technology can avoid the loss of colored steel plates and expand the freedom of colored steel plates when temperature changes, reducing the overall deformation of the roof and ensuring better waterproofing effect of the roof system.

What are the requirements for the construction of YX18-76-988 color steel plates?

When using color boards for construction, the following requirements must be strictly followed to ensure installation effectiveness:

In order to achieve better waterproof effect, after the installation of the roof panel, we use special tools to fold the roof panel 3cm towards the ridge, about 800.

2. If the roof panels transported to the roof truss are not fully installed on the same working day, they should be firmly fixed to the steel roof truss using adhesive methods. Specifically, they can be firmly bound to palm ropes or 8-strand wires, which will prevent any damage to the roof panels in windy weather.

3. It is worth noting that the ridge cover plate should be constructed as soon as possible after the roof is completed. If construction cannot be carried out immediately, plastic cloth should be used to protect the insulation material at the ridge to prevent insulation effects on rainy days.

4. During the construction of the ridge cover plate, the sealing between the ridge cover plate and the top plate should be ensured to be reliable. When hoisting the roof to the roof truss for installation, the main ribs of the roof panel should face towards the initial installation. Ensure that the installation position of the first board is correct. Check the verticality between the first board and the gutter. After ensuring the correct size, fix the first board first, then use the same method to install the subsequent boards, and always use the same method to ensure that the ends of the roof panel are in a straight line.


1689301462619601.jpeg



Phone: (+86) 137-7105-3760

Contact person: Mr. Xiao

Address: Workshop No. 9, Baishiao No.3, Xiashan, Hengpi Town, Enping City, Guangdong Province



Navigation


Home                          Products

About                          Cases

News                          Contact





WeChat


×
seo seo