|
YX62-450 Color Steel Roof Panel
The protection of finished YX62-450 color steel roof panels directly affects their service life. Therefore, during the installation of roof panels, strict protective measures must be taken when walking on the roof. After the installation of the roof panel is completed, wooden springboards are laid on the roof as transportation and walking channels. It is strictly prohibited to walk directly on the roof panel. 1. The theodolite should first determine the verticality of the roof structural system, and set baseline and eaves parallel lines at both ends of the gable and skylight. The baseline and parallel lines must be vertical and square, and debris on the purlins must be removed before the installation of the roof panel can begin. When lifting the roof panel, special lifting tools must be used to lift the roof profiled panel to the roof. The roof panels must be stacked evenly and not in the middle of the purlins to avoid deformation. 3. According to the layout plan and local meteorological conditions, arrange the wind direction opposite to the rainy season. First scatter it on the roof, lay a section of roof panels, and then spread them forward one by one. After the spacing between each column is arranged, the parallel lines between each column and the end wall should be checked. If errors are found, they should be corrected at any time and the eaves should be kept neat. 4. First lay the roof bottom plate, and then install the Z-shaped steel. Z-shaped steel and bottom plate are fixed together with self tapping screws. Place three self tapping screws at the width of each bottom plate, evenly distributed, and seal the joints between the waves of the bottom plate. 5. Lay glass wool on the bottom plate. Glass wool must be tightly and evenly distributed, without any leakage, to avoid affecting the insulation effect. 6. The end fixed bracket and the middle fixed bracket are placed on the Z-shaped steel, and the fixed bracket is fixed to the purlin with self tapping screws. The wave spacing of the fixed bracket is consistent with that of the top plate, and the wave spacing is strictly controlled during installation. 7. The bracket (fastener) on the fixed bracket must be fastened with the bolts of the fixed bracket. The overlap between the bracket and the top plate must be flat and even. The roof panel and bracket are fixed with an interlocking machine, and then the interlocking machine is leveled along the overlap between the roof panel and the bracket. During the installation of roof panels, ridge cover plates, ridge stopper plates, water blocking plates, eaves stopper plates, and waterproof sealing stickers can be installed simultaneously. When installing the ridge cover plate, it should be kept flat and consistent with the two slope plates, and the ridge plug plate and water blocking plate should be correctly placed and fixed. When installing the roof, construction equipment and tools must be lifted above the panel and placed gently when moving. When construction personnel walk on the roof, they must wear insulated soft soled shoes and remove debris from the roof panel every day to prevent corrosion and scratches. 11. All positions that require sealing paste must not be missed. After installing the roof slab, remove all debris and iron filings from the roof. If scratches are found on the coating of the roof panel, repair it with special repair paint for color boards. If the rivet is empty, the rivet and sealing paste should be used at any time, and the rubber gasket should not be damaged.
|
