What details need to be addressed when pouring steel truss floor support plates

Friends who have been engaged in steel structure engineering construction for many years should know that the production process of steel truss floor load-bearing plates is much better than traditional floor load-bearing plates. A large number of high-altitude operations have been removed, which not only saves labor costs but also time costs, greatly improving work efficiency. Modern mechanical equipment also ensures product quality and reduces opportunities for rework and poor quality. Therefore, in recent years, floor load-bearing plate manufacturers have invested more in steel truss floor load-bearing plates, with strict details in every stage of production, processing, installation, and construction.

The laying of steel truss floor slabs is not difficult, but the pouring of concrete after laying is a highly technical task. If the overall situation is not controlled, it will affect the entire steel structure project, causing a lot of trouble in terms of schedule and quality. What specific attention should be paid to? Next, we will share the details of floor concrete pouring.

Before pouring concrete, the surface of the steel truss floor support plate must be cleaned of dust, grease, impurities, and porcelain rings.

2. Operators, tool carts, and other areas with more frequent movements should ensure their stability and can be fixed by laying scaffolding.

3. The concrete pouring process will not cause small impacts on the steel truss floor support plate. When pouring, it should be placed directly opposite the steel beam or temporary support. The dumping range and temporary accumulation caused by dumping shall not exceed the steel truss floor support plate within 1/6 of the left and right span of the steel beam or temporary support.

When pouring concrete, it should be quickly pushed away to avoid excessive accumulation and avoid the impact caused by pouring concrete.

5. It is strictly prohibited to pour concrete in the middle or temporary support position of the slab span. The pump pipe bracket should be fixed on the steel beam.

6. After pouring, no other loads shall be applied to the floor until the concrete strength reaches 75%.

The pouring of steel truss floor slabs is only one aspect of steel structure construction, but it is an important guarantee for the overall quality and reliability of the project. Details determine success or failure, and floor manufacturers should place controlling details in an important position in enterprise management.


1714981995192642.jpeg




Phone: (+86) 137-7105-3760

Contact person: Mr. Xiao

Address: Workshop No. 9, Baishiao No.3, Xiashan, Hengpi Town, Enping City, Guangdong Province



Navigation


Home                          Products

About                          Cases

News                          Contact





WeChat


seo seo