Several key elements for strengthening floor slabs

What is floor slab? In fact, floor slab only provides a sturdy construction platform in a short period of time, which is for the convenience of construction. Many people mistakenly believe that the function of floor slabs is only to bear weight, but in fact, their load-bearing function is only to bear the importance of concrete in a short period of time. After the concrete dries, the function of floor slabs basically disappears. So how can we strengthen the use of floor slabs? Let's take a look and understand together with the editor.

1¡¢ First, pop out the centerline of the steel beam in the planking area, and the centerline of the main beam is the control line for fixing the position of the floor support plate. The centerline of the main beam controls the width of the overlap between the floor support plate and the steel beam, and determines the position of the welding points for the fusion welding between the floor support plate and the steel beam. The centerline of the secondary beam will determine the welding position of the penetration welding bolts. When fixing the bolts, the centerline and flange width of the secondary beam should be bounced back onto the floor support plate on the surface of the secondary beam.

2¡¢ Clean the floor slabs in layers and zones according to the material list at the stacking site, and indicate their numbers. Clearly distinguish the layers, zones, and numbers, mark them with a marker pen, and accurately transport them to the designated construction site.

3¡¢ When lifting, special soft slings are used to ensure that the floor support plate is not deformed as a whole and not curled locally. Steel structure design with multiple floors generally adopts a 3-story column installation process, and the installation of floor support plates should be synchronized with the construction of steel structure columns and beams, with a minimum difference of 3 floors. Therefore, when lifting the floor slab, it can only pass through the upper beams and columns, and the crane operator should control it layer by layer between the beams and columns.

4¡¢ When using plasma cutting machines or cutting pliers to cut edges and corners, the excess amount during cutting and laying should be controlled within 5mm. Measures should be taken when pouring concrete to prevent grout leakage.

5¡¢ The connection between the floor support plate and the side plate of the floor support plate is pressed with bite pliers, so that the single floor support plates are connected into a whole plate. First spot weld the side edges of the floor support plate, then fix the two ends, and then use bolts for fixation.


1715221347411950.jpeg


Phone: (+86) 137-7105-3760

Contact person: Mr. Xiao

Address: Workshop No. 9, Baishiao No.3, Xiashan, Hengpi Town, Enping City, Guangdong Province



Navigation


Home                          Products

About                          Cases

News                          Contact





WeChat


seo seo